Restoration and fitting in Bromley (BR1), Kent.

We removed 2 antique marbles and cast iron inserts in desperate need of some TLC. When removed marble surrounds commonly separate into panels, then the panels need to be repaired then polished and finally rebuilt. Its similar with the cast iron, first its sandblasted back to bare metal then any repairs are carried out before being finished in the desired finish. The fireplaces were installed as gas fireplaces with slate hearths. The whole process takes around 3-4 weeks from removal to refitting.